From:                              route@monster.com

Sent:                               Friday, April 08, 2016 12:12 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 PMP

 

This resume has been forwarded to you at the request of Monster User xapeix03

Akinyemi Akindejoye 

Last updated:  03/08/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Houston, TX  77077
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Akinyemi Akindejoye

Resume Value: isxieeqe2f7s98vd   

  

 

AKINYEMI AKINDEJOYE

Richmond TX, 77042 Tel: (832)-768-6885akinyemiakindejoye@gmail.com

 

Professional Designation:

Project Scheduler

 

Professional Profile

Project controls professional with solid expertise in project scheduling. Experienced in project implementation, earned value management and project engineering. I possess the drive to add value to any organization where my expertise are challenged and engaged to perform at the highest optimal level

 

Technical Expertise

Microsoft Applications │  Microsoft Office│ Microsoft Project │Oracle Primavera P6 │Microsoft Visio│ AutoCAD│ IBM Maximo Scheduling Software│ SAP Prometheus planning/scheduling systems

 

Professional History

 

British Petroleum Refinery – Whiting , Indiana       July 2015 – December 2015

 

Project Scheduler  

 

§ Pulled together required information to initiate an EPC plan/schedule including scopes of work, estimate, job notes, work list and drawings.

§ Developed the plan to logically execute a project with appropriate engineering and field supervisor.

§ Developed Durations and resources needed to execute the project in a timely fashion.

§ Produced planning/scheduling reports on a consistent basis.

§ Communicated the plan/schedule to all project team members, including client.

§ Monitored progress through engineering and in the field and update the plan/schedule accordingly.

§ Monitored craft hours spent and earned, analyze productivity and its impact on project duration.

§ Analyzed the updated plan/schedule and communicated potential downstream problems which may impact the successful completion of a project.

§ Walked the field down on a regular basis.

§ Accounted for Change Orders in the plan/schedule and analyze their impact on the project.

§ Attended meetings and discussed the EPC plan/schedule.

 

 

Flint Hill Resources - Corpus Christi, TXSept 2013 – July 2015

Project Scheduler - Flint Hill Resource Refinery Project worth $7million USD

§ Evaluated critical paths in the project schedules and evaluate alternative schedule options to identify optimum project strategies or resolve problems before and during execution

§ Provided resource planning and project schedules for various types of projects.

§ Liaised with all team leaders to communicate required completion dates and interfaces between responsible parties

§ Managed and coordinated with project team members on project schedule and interface

§ Uploaded Projects Schedule from MS Project to SharePoint and PWA. (Project Web Access

§ Established and managed relationships with client to ensure 100 percent customer satisfaction in quality of service and commitment to long-term relationship

§ Produced reports (Man-hour productivity, schedule status, MDR- Master Data Records) and earned value curves reports on either direct or indirect construction activities that are a part of the work.

§ Worked closely with Project Manager, and Project Management to ensure timely delivery of project activities and make sure project objectives are met. 

 

Baker Hughes - Houston, TXJuly 2012 -Feb 2013

Project Scheduler - Implemented an integrated scheduling plan on a two year contract for the PMO on a variety of projects, established automated IT processes and implemented project scheduling tools (Budget-$250 million)

§ Created project schedule with 9500 line items in MS Project 2010

§ Uploaded Projects Schedule from MS Project to SharePoint and PWA (Project Web Access)

§ Evaluated resource allocation with Assignment reports in MS Project

§ Man loaded the Microsoft Flex schedule in the generation of manpower histograms and Progress Curves

§ Tracked and reported project schedule issues and improvement strategies to Program Manager

§ Prepared and presented status on project schedule, project deliverables, and project risks

§ Reviewed progress against plan and make recommendations to improve efficiency

§ Produced reports (Man-hour productivity, schedule status, MDR- Master Data Records) and earned value curves reports on either direct or indirect construction activities that are a part of the work

§ Maintained all subsidiary reports such as personnel staffing, release schedules, equipment schedules to facilitate good cost projections (EAC)

§ Prepared standard earned value-based reports, including schedule updates

 

 

 

 

Intersea - Houston, TX                                                                 May 2011 - June 2012

Project Scheduler(Flex LNG Project – joint venture)

§ Managed and worked as a project scheduler on the Flex LNG project, with a budget worth about $150.5Million USD which is joint venture project with intersea

§ Consolidated and analyzed information from Project Engineering, Sourcing and the Manufacturing Project Planners to develop the overall project Schedule (baseline time-phased schedule with proper constraints) and Work Breakdown Structure (WBS) for assigned project sales orders

§ Familiar with all facets of Scheduling from FEED / DETAIL Packages through Construction.

§ Conducted and participated in Schedule Reviews as appropriate to ensure that schedule requirements are being met

§ Participated in weekly meetings with the Project Planners to obtain manufacturing status (production schedules for parts, and production start dates), to update the project schedule

§ Analyzed the project schedule, monitors progress and highlights potential cost/schedule variances. Recommends Corrective Action Plans for Project Management approval

§ Analyzed critical path and restraints to determine the effect of changes to the schedule. Recommends work alternative solutions

§ Ensured that the accounting process, including revenue and cost recognition and sales order project activities are compliant with the Work Breakdown Structure (WBS)

 

Chesapeake Energy/Access Midstream - Oklahoma City, Oklahoma March 2010 - April 2011

Project Scheduler (Douglas Wyoming Pipeline Construction Project )

§ Performed Resource Optimization For the Pipe Line Project. 

§ Responsible for building project schedule with Microsoft Project by creating Work Breakdown Structure (WBS)

§ Assigned activity relationships, input activities and activity durations

§ Loaded resources into the project schedule with the resource

§ Tracked project progress with schedule baseline and reported activities on critical path

§ Performed critical path analysis, earned value analysis, variance analysis, and forecasting

§ Communicated project status to the Project Manager, Project Management Team (PMT), and the client

§ Worked closely with Project Manager, and Project Management to ensure timely delivery of project activities and make sure project objectives are met

§ Performed and reported schedule updates, changes and constraints to the Project Manager

§ Issued two weeks look ahead report and reviewed the reports with the Project Management Team

 

Cimarex Energy - Denver, COFeb 2009 -Feb 2010

Project Planner/Scheduler(Permian Basin Oil Field Drilling Project)

§ Created and maintained detailed drilling schedules based on Work Breakdown Structure (WBS) with task definitions, relationships, and dependencies

§ Worked directly with Project Manager and functional group leads to discuss impact of work and problem resolution

§ Evaluated actual project progress and provided schedule updates

§ Identified critical path activities, near critical path activities, and advised project team accordingly

§ Communicated project status report to Project Management Team (PMT) and client on a monthly basis

§ Created milestones to identify the start of work including activities that required constraints
Printed 3-weeks look ahead with columns to indicate remaining duration

§ Assigned duration, load activities with resources, maintained and assigned baseline schedules for the project.

 

 

URS Corporation - Houston, TXJuly 2007–Jan2009

Project Scheduler

 

§ Worked closely with PM leadership and Project Managers to address project or departmental activities.

§ Assisted PM Leadership, Portfolio PMs, and Project Managers with administrative tasks (tracking down and resolving issues discovered during monthly financial updates.

§ Updated actual spend/identified issues on large project plans, chasing down vendors that have not completed status reports on time.

§ Set-up large project meetings, scheduled rooms for meetings, documented minutes, helped with the procurement process, created reports / presentations, assisted process improvement initiatives, etc.

§ Assisted VP with documenting updates, meeting coordination, set-up and notes .

§ Managed the Construction project, task list and coordinated Implementations & Development.

§ Facilitated follow-up with project stakeholders and business leaders.

§ Produced and distributed project related documentation and updates required for meetings with VP.

§ Managed due dates and timelines related to open projects and tasks.

§ Created, maintained, monitored & controlled Master Portfolio schedule in MS Project

 

Dow Chemistry - Freeport, TXMay 2005 - May 2007

Project Scheduler (Oil & Gas)

§ Maintained the construction schedule of Mounted Ball Valves, Floating Ball Valves, and full opening check valves used by oil producing company.

§ Monitored actual progress, compared to baseline and report progress against schedule in primaveraP6.

§ Planned, developed and setup the Integrated Schedule in Primavera for Engineering Design,

§ Procurement and Construction (EPC) schedule for the company Project.

§ Determined and analyzed critical path activities on Primavera for identification of potential delay impacts.

§ Guaranteed the accuracy of the information that the Project Manager receives and, if necessary, investigate further by checking with the field engineers if required.

§ Updated, consolidated, validated and recorded the Project Baseline Schedule from Primavera with allthe parties actively involved. Collected and consolidated the physical progress follow-up for projects and update it in Primavera.

 

Education

Prairie View A&M University

MBA, Finance(Expected graduation 2017)

 

Prairie View A&M University

BSc. Chemical Engineering

 

TWIC Card Holder(Transportation Worker Identification Credential)

OSHA 10 Certified

 

Professional Affiliation and Certifications

Project Management Institute (PMI Member)

PMP Certification in Progress (Expected completion May 2016)

 



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-TX-Houston